SABAM, MANULLANG, (2023) RANCANGAN PROSES ROBOTIC PROCESS AUTOMATION (RPA) PADA PURCHASE ORDER KOMPONEN UNTUK MENINGKATKAN PRODUKTIVITAS JAM KERJA DAN REDUKSI BIAYA (STUDI KASUS: PT TOYOTA MOTOR MANUFACTURING INDONESIA). Undergraduate thesis, UNIVERSITAS DIPONEGORO.
|
Text
TI.23.134 Manullang, Sabam.pdf Download (324kB) |
|
|
Text (ABSTRAK)
TI.23.134 Manullang, Sabam.pdf Download (324kB) |
Abstract
roject Planning Management (PPM) adalah departemen yang bertanggung jawab pada pengembangan model mobil baru Toyota. Salah satu posisi yang ada di departemen PPM
adalah Part Procurement.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Industrial Engineering |
| Depositing User: | Mr sholikin FT |
| Date Deposited: | 13 Mar 2026 04:14 |
| Last Modified: | 13 Mar 2026 04:14 |
| URI: | https://eprints2.undip.ac.id/id/eprint/47478 |
Actions (login required)
![]() |
View Item |
