HAFIZ, THARIQ HAYDAR and ZULKIFLI, JINAN (2026) ASSESSING THE IMPLEMENTATION OF LAST PLANNER SYSTEM AND VALUE STREAM MAPPING OF THE APPROACH WORK IN THE KALIGAWE BRIDGE SEMARANG – DEMAK TOLL ROAD CONSTRUCTION PROJECT. Undergraduate thesis, Universitas Diponegoro.
|
Text
Thariq-Haydar-Hafiz_21010120190058_Abstrak.pdf Download (340kB) |
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering > Civil Engineering |
| Divisions: | Faculty of Engineering > Department of Civil Engineering |
| Depositing User: | lis setyowati |
| Date Deposited: | 11 Mar 2026 00:52 |
| Last Modified: | 11 Mar 2026 00:52 |
| URI: | https://eprints2.undip.ac.id/id/eprint/47173 |
Actions (login required)
![]() |
View Item |
