GUPITA, AZMI PRASETYA (2025) ENENTUAN WAKTU STANDAR DAN JUMLAH TENAGA KERJA DI AREA PREPARATION PADA MODEL PRODUK GWC-18MOO5A PT XYZ. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.
|
Text (ABSTRAK)
TI.32 AZMI PRASETYA GUPITA.pdf Download (181kB) |
Abstract
PT XYZ mengalami inefisiensi dalam proses material preparation produk GWC18MOO5A
akibat
tidak
adanya
standar
waktu
yang
jelas
dan
alokasi
tenaga
kerja
yang
optimal, yang menyebabkan lost time dan idle operator.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Industrial Engineering |
| Depositing User: | Mr sholikin FT |
| Date Deposited: | 13 Feb 2026 08:07 |
| Last Modified: | 13 Feb 2026 08:07 |
| URI: | https://eprints2.undip.ac.id/id/eprint/45278 |
Actions (login required)
![]() |
View Item |
