FIAGI, HARI SAKTI (2025) OPTIMASI PROSES MATERIAL PREPARATION DENGAN STANDARD TIME DAN JUMLAH MANPOWER MODEL PRODUK W10W92-4B DI AREA PREPARATION PT. XYZ. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.
|
Text (ABSTRAK)
TI.31 Naufal Hilmi Habibi.pdf Download (181kB) |
Abstract
Area preparation memiliki peran penting dalam kelancaran produksi, namun pada
PT XYZ, proses material preparation model produk W10W92-4B mengalami
inefisiensi akibat tidak adanya standar waktu kerja dan ketidakseimbangan alokasi
tenaga kerja.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Industrial Engineering |
| Depositing User: | Mr sholikin FT |
| Date Deposited: | 13 Feb 2026 08:02 |
| Last Modified: | 13 Feb 2026 08:02 |
| URI: | https://eprints2.undip.ac.id/id/eprint/45277 |
Actions (login required)
![]() |
View Item |
