Search for collections on Undip Repository

OPTIMASI PROSES MATERIAL PREPARATION DENGAN STANDARD TIME DAN JUMLAH MANPOWER MODEL PRODUK W10W92-4B DI AREA PREPARATION PT. XYZ

FIAGI, HARI SAKTI (2025) OPTIMASI PROSES MATERIAL PREPARATION DENGAN STANDARD TIME DAN JUMLAH MANPOWER MODEL PRODUK W10W92-4B DI AREA PREPARATION PT. XYZ. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.

[thumbnail of ABSTRAK] Text (ABSTRAK)
TI.31 Naufal Hilmi Habibi.pdf

Download (181kB)

Abstract

Area preparation memiliki peran penting dalam kelancaran produksi, namun pada
PT XYZ, proses material preparation model produk W10W92-4B mengalami
inefisiensi akibat tidak adanya standar waktu kerja dan ketidakseimbangan alokasi
tenaga kerja.

Item Type: Thesis (Undergraduate)
Subjects: Engineering
Divisions: Faculty of Engineering > Department of Industrial Engineering
Depositing User: Mr sholikin FT
Date Deposited: 13 Feb 2026 08:02
Last Modified: 13 Feb 2026 08:02
URI: https://eprints2.undip.ac.id/id/eprint/45277

Actions (login required)

View Item View Item