Search for collections on Undip Repository

EVALUASI PERFORMANCE TEST PADA PLTU PELABUHAN RATU UNIT 2 DENGAN PI VISION

YOHANES, A.R. and Widayat, Widayat and Windarta, Jaka (2024) EVALUASI PERFORMANCE TEST PADA PLTU PELABUHAN RATU UNIT 2 DENGAN PI VISION. Masters thesis, UNIVERSITAS DIPONEGORO.

[thumbnail of HAL COVER.pdf] Text
HAL COVER.pdf

Download (979kB)
[thumbnail of BAB I PENDAHULUAN.pdf] Text
BAB I PENDAHULUAN.pdf

Download (208kB)
[thumbnail of BAB II TINJAUAN PUSTAKA.pdf] Text
BAB II TINJAUAN PUSTAKA.pdf

Download (1MB)
[thumbnail of BAB III METODE PENELITAIN.pdf] Text
BAB III METODE PENELITAIN.pdf
Restricted to Repository staff only

Download (490kB)
[thumbnail of BAB IV PEMBAHASAN.pdf] Text
BAB IV PEMBAHASAN.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB V PENUTUP.pdf] Text
BAB V PENUTUP.pdf

Download (9kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (258kB)

Abstract

Di Indonesia, pembangkitan listrik masih didominasi oleh pembangkit listrik tenaga uap (PLTU) batubara. Hal ini didukung dengan perencanaan energi primer yang dominan hingga tahun 2050 di Indonesia, sehingga upaya konservasi energi PLTU perlu ditingkatkan melalui audit energi secara detail. Penelitian ini bertujuan untuk memberikan gambaran pola konsumsi energi baik dari bahan bakar yang digunakan dan pemakaian sendiri dari energi yang dihasilkan, mengidentifikasi peralatan pengguna energi utama (significant energy user) dari tiap-tiap fasilitas pengguna energy, melakukan evaluasi terhadap unjuk kerja (performance) peralatan pembangkit energi guna memperoleh gambaran tingkat efisiensi pada peralatan dan mencari peluang penghematan energi dan mengajukan usulan untuk peningkatan efisiensi penggunaan energi. Metode yang digunakan dalam penelitian ini adalah dengan pemasangan alat ukur di lapangan dan audit energi secara hybrid. Yang mana sistem hybrid dapat membaca parameter secara realtime dengan menggunakan aplikasi PI Vision, aplikasi ini di desain khusus untuk mendapatkan data sesuai kebutuhan data audit energi. Hal ini akan dibandingkan nilai NPHR antara kondisi aktual dengan commissioning berdasarkan standar ASME PTC. Berdasatkan hasil optimalisasi pi vision diperoleh kenaikan NPHR pada saat performance test actual dibandingkan dengan baseline sebesar 72,38 kcal/kwh, dari 2,621,82 kcal/kwh menjadi 2,694,20 kcal/kwh, Kenaikan NPHR tersebut berpotensi mengakibatkan potensi losses enegi setara dengan Rp 37,376,000,000 pertahun.
Kata kunci: Pembangkit Listrik, Audit Energi, PI Vision, NPHR

In Indonesia, electricity generation is still dominated by coal-fired steam power plants (PLTU). This is supported by the dominant primary energy planning until 2050 in Indonesia, so that PLTU energy conservation efforts need to be increased through detailed energy audits. This research aims to provide an overview of energy consumption patterns both from the fuel used and the own use of the energy produced, identify the main energy user equipment (significant energy user) of each energy user facility, evaluate the performance of the equipment energy generators to obtain an overview of the level of efficiency of equipment and look for energy saving opportunities and submit proposals for increasing the efficiency of energy use. The method used in this research is the installation of measuring equipment in the field and a hybrid energy audit. The hybrid system can read parameters in real time using the PI Vision application, this application is specially designed to obtain data according to energy audit data requirements. This will compare the NPHR value between actual conditions and commissioning based on ASME PTC standards. Based on optimalization using pi vison obtained the increase of NPHR while performance test if compare baseline data about 72,38 kcal/kwh, from 2,6212,82 kcal/kwh to 2,694,20 kcal/kwh, the increase of NPHR it will be potential to caused losses energy, it equals to IDR 37,376,000,00/year.
Keywords: Power Generation, Energy Audit, PI Vision, NPHR

Item Type: Thesis (Masters)
Uncontrolled Keywords: Pembangkit Listrik, Audit Energi, PI Vision, NPHR
Subjects: Engineering
Divisions: Postgraduate Program > Master Program in Energy
Depositing User: ekana listianawati
Date Deposited: 03 Dec 2024 07:56
Last Modified: 03 Dec 2024 07:56
URI: https://eprints2.undip.ac.id/id/eprint/27778

Actions (login required)

View Item View Item