ANALISIS TEKNOEKONOMI IMPLEMENTASI PLTS ATAP MODUL MONOKRISTALIN DAN POLYCRISTALIN SEBAGAI SUMBER ENERGI UNTUK PEMAKAIAN SENDIRI DI GARDU INDUK (GI) PRABUMULIH

PARDEDE, Gamaliel Pangeran Valentino and Sutanto, Heri and Darjat, Darjat (2026) ANALISIS TEKNOEKONOMI IMPLEMENTASI PLTS ATAP MODUL MONOKRISTALIN DAN POLYCRISTALIN SEBAGAI SUMBER ENERGI UNTUK PEMAKAIAN SENDIRI DI GARDU INDUK (GI) PRABUMULIH. Masters thesis, UNIVERSITAS DIPONEGORO.

[thumbnail of HAL COVER-1.pdf] Text
HAL COVER-1.pdf

Download (175kB)
[thumbnail of HAL COVER.pdf] Text
HAL COVER.pdf
Restricted to Repository staff only

Download (881kB)
[thumbnail of BAB I.pdf] Text
BAB I.pdf

Download (262kB)
[thumbnail of BAB II.pdf] Text
BAB II.pdf

Download (722kB)
[thumbnail of BAB III.pdf] Text
BAB III.pdf
Restricted to Repository staff only

Download (406kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Repository staff only

Download (663kB)
[thumbnail of BAB V.pdf] Text
BAB V.pdf
Restricted to Repository staff only

Download (159kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (203kB)

Abstract

Penelitian ini menganalisis kelayakan teknis, ekonomi, dan lingkungan dari perancangan Pembangkit Listrik Tenaga Surya (PLTS) atap di Gardu Induk (GI) Prabumulih. Tujuan utamanya adalah mengurangi ketergantungan gardu terhadap jaringan listrik utama PLN untuk memenuhi beban Pemakaian Sendiri (PS). Melalui simulasi menggunakan perangkat lunak PVsyst, penelitian ini membandingkan kinerja dari beberapa variasi proporsi modul PV monokristalin dan polikristalin pada area atap potensial seluas 528 m².
Hasil simulasi teknis menunjukkan bahwa konfigurasi sistem homogen (100% monokristalin atau 100% polikristalin) menghasilkan Performance Ratio (PR) terbaik di atas 74% karena sukses meminimalkan mismatch losses. Meski luasan atap mampu menampung hingga 200 modul, instalasi dengan kapasitas maksimal terbukti tidak layak secara finansial. Hal ini disebabkan oleh surplus energi hingga 62% yang tidak bisa diekspor ke jaringan akibat batasan regulasi Permen ESDM No. 2/2024.
Oleh karena itu, dilakukan penyesuaian kapasitas terpasang PLTS atap agar produksi sistem sesuai dengan kebutuhan beban aktual. Berdasarkan optimasi, konfigurasi 100% polikristalin dengan kapasitas 42 kWp ditetapkan sebagai skenario paling direkomendasikan untuk mensupply energi beban self consumption gedung operasional GI prabumulih 3.156,5 kWh/bulan dan beban rumah dinas 1,536 kWh/bulan. Skenario ini terbukti sangat layak secara ekonomi dengan Payback Period tercepat yakni 7,6 tahun, dan IRR 14,2%, serta berkontribusi positif dalam mereduksi emisi karbon. Penyesuaian antara kapasitas sistem dengan profil beban eksisting merupakan faktor yang paling berpengaruh terhadap kelayakan investasi PLTS atap.
Kata Kunci : PLTS Atap, PVsyst, Self-Consumption, Kelayakan Ekonomi, Gardu Induk

This study evaluates the technical, economic, and environmental feasibility of a rooftop photovoltaic (PV) system at the Prabumulih Substation (GI Prabumulih). The primary objective is to reduce the substation’s dependence on electricity supplied by the national utility grid (PLN) for its internal operational load (self-consumption). Using PVsyst simulation software, the study compares the performance of different proportions of monocrystalline and polycrystalline PV modules installed on a rooftop area of 528 m².
The technical simulation results indicate that homogeneous PV configurations (100% monocrystalline or 100% polycrystalline) achieve the highest Performance Ratio (PR), exceeding 74%, due to lower mismatch losses. Although the available rooftop area can accommodate up to 200 PV modules, installing the maximum system capacity was found to be financially unfeasible. This is primarily due to energy surplus reaching 62%, which cannot be exported to the utility grid under the provisions of the Minister of Energy and Mineral Resources Regulation No. 2 of 2024.
Therefore, the installed PV capacity was optimized to align electricity generation with the actual load demand. The optimization results identified the 100% polycrystalline configuration with an installed capacity of 42 kWp as the most suitable scenario for supplying the self-consumption demand of the GI Prabumulih operational building (3,156.5 kWh/month) and staff housing facilities (1,536 kWh/month). This scenario demonstrated strong economic viability, achieving the shortest Payback Period of 7.6 years, and an Internal Rate of Return (IRR) of 14.2%. In addition, the system contributes positively to carbon emission reduction. The findings indicate that matching PV system capacity with the existing load profile is the most critical factor affecting the economic feasibility of rooftop PV investments.
Keyword : Rooftop Photovoltaic System, PVsyst, Self-Consumption, Economic
Feasibility, Electrical Substation

Item Type: Thesis (Masters)
Uncontrolled Keywords: PLTS Atap, PVsyst, Self-Consumption, Kelayakan Ekonomi, Gardu Induk
Subjects: Engineering
Divisions: Postgraduate Program > Master Program in Energy
Depositing User: ekana listianawati
Date Deposited: 19 Nov 2026 02:40
Last Modified: 19 Nov 2026 02:40
URI: https://eprints2.undip.ac.id/id/eprint/64440

Actions (login required)

View Item View Item