Search for collections on Undip Repository

ANALISIS KESTABILAN LERENG HIGHWALL MENGGUNAKAN METODE MORGENSTERN-PRICE PADA PT ALLIED INDO COAL JAYA PIT UTARA BLOK DANAU BIRU DESA PARAMBAHAN, KOTA SAWAHLUNTO, PROVINSI SUMATERA BARAT

GULTOM, YESAYA PARTOGI VALENTINO (2026) ANALISIS KESTABILAN LERENG HIGHWALL MENGGUNAKAN METODE MORGENSTERN-PRICE PADA PT ALLIED INDO COAL JAYA PIT UTARA BLOK DANAU BIRU DESA PARAMBAHAN, KOTA SAWAHLUNTO, PROVINSI SUMATERA BARAT. Undergraduate thesis, FAKULTAS TEKNIK, UNIVERSITAS DIPONEGORO.

[thumbnail of ABSTRAK] Text (ABSTRAK)
YESAYA PARTOGI VALENTINO GULTOM.pdf

Download (173kB)

Abstract

Aktivitas penambangan batubara dengan sistem open pit di PIT Utara Blok Danau Biru PT Allied Indo Coal Jaya terus berkembang seiring pembukaan bukaan tambang baru.

Item Type: Thesis (Undergraduate)
Subjects: Engineering
Divisions: Faculty of Engineering > Department of Geological Engineering
Depositing User: Mr sholikin FT
Date Deposited: 28 Oct 2026 02:41
Last Modified: 28 Oct 2026 02:41
URI: https://eprints2.undip.ac.id/id/eprint/63711

Actions (login required)

View Item View Item