Search for collections on Undip Repository

EVALUASI ENERGI PEMANFAATAN GAS BUANG SEBAGAI PEMANAS BAHAN BAKAR GAS PADA TURBIN GAS BERBASIS SIMULASI MENGGUNAKAN PERANGKAT LUNAK DWSIM

FAUZI, Achbar and Kiono, Berkah Fajar Tamtomo and Christwardana, Marcelinus (2026) EVALUASI ENERGI PEMANFAATAN GAS BUANG SEBAGAI PEMANAS BAHAN BAKAR GAS PADA TURBIN GAS BERBASIS SIMULASI MENGGUNAKAN PERANGKAT LUNAK DWSIM. Masters thesis, UNIVERSITAS DIPONEGORO.

[thumbnail of cover aja.pdf] Text
cover aja.pdf

Download (52kB)
[thumbnail of HalCover.pdf] Text
HalCover.pdf
Restricted to Repository staff only

Download (938kB)
[thumbnail of BAB I PENDAHULUAN.pdf] Text
BAB I PENDAHULUAN.pdf

Download (194kB)
[thumbnail of BAB II TINJAUAN PUSTAKA.pdf] Text
BAB II TINJAUAN PUSTAKA.pdf

Download (487kB)
[thumbnail of BAB III METODE PENELITIAN.pdf] Text
BAB III METODE PENELITIAN.pdf
Restricted to Repository staff only

Download (436kB)
[thumbnail of BAB IV.pdf] Text
BAB IV.pdf
Restricted to Repository staff only

Download (1MB)
[thumbnail of BAB V KESIMPULAN DAN SARAN.pdf] Text
BAB V KESIMPULAN DAN SARAN.pdf
Restricted to Repository staff only

Download (239kB)
[thumbnail of DAFTAR PUSTAKA.pdf] Text
DAFTAR PUSTAKA.pdf

Download (144kB)
[thumbnail of LAMPIRAN.pdf] Text
LAMPIRAN.pdf
Restricted to Repository staff only

Download (213kB)

Abstract

Studi ini meneliti penggunaan panas gas buang untuk memanaskan bahan bakar gas pada turbin gas GE 09HA.02. Tujuannya adalah untuk mengevaluasi potensi pemulihan panas, karakteristik titik jepit (pinch point), dan peningkatan kinerja energi sistem pada beban operasi 50%, 75%, dan 100%. Analisis titik jepit dan simulasi proses dengan DWSIM digunakan. Pada konfigurasi saat ini, gas buang dibuang tanpa pemulihan panas. Pada sistem yang disimulasikan, panas gas buang dipulihkan melalui HX-1 untuk menaikkan suhu gas alam dari 17°C menjadi 215°C sebelum pembakaran. Hasil menunjukkan bahwa beban operasi yang lebih tinggi meningkatkan panas yang dapat dipulihkan, dengan Qrecovered meningkat dari 7,34 MW pada beban 50% menjadi 9,93 MW pada beban 75%, dan mencapai 13,00 MW pada beban 100%. Nilai titik jepit tetap relatif stabil pada 125,5°C, 126,5°C, dan 126,3°C. Penerapan preheater meningkatkan daya turbin, kerja siklus, dan efisiensi termal di semua kondisi beban. Pada beban 100%, daya turbin meningkat dari 999,56 MW menjadi 1016,84 MW, kerja siklus dari 520,36 MW menjadi 538,20 MW, dan efisiensi termal dari 42,064% menjadi 43,506%. Temuan ini menunjukkan bahwa pemanfaatan panas gas buang sebagai pemanas gas bahan bakar meningkatkan efisiensi energi internal dan mengurangi kehilangan panas dalam sistem turbin gas.
Kata kunci: analisis pinch; simulasi DWSIM; pemulihan panas limbah; pemanas awal gas bahan bakar; turbin gas GE 09HA.02

This study examines the use of exhaust-gas heat to preheat the gas fuel in the GE 09HA.02 gas turbine. The objective is to evaluate heat recovery potential, pinch point characteristics, and improvements in system energy performance at operating loads of 50%, 75%, and 100%. Pinch analysis and process simulation with DWSIM are employed. In the current configuration, exhaust gas is discharged without heat recovery. In the simulated system, exhaust gas heat is recovered via HX-1 to raise natural gas temperature from 17°C to 215°C before combustion. Results demonstrate that higher operating loads increase recoverable heat, with Qrecovered rising from 7.34 MW at 50% load to 9.93 MW at 75% load, and reaching 13.00 MW at 100% load. Pinch point values remain relatively stable at 125.5°C, 126.5°C, and 126.3°C. Implementing the preheater increases turbine power, cycle work, and thermal efficiency across all load conditions. At 100% load, turbine power rises from 999.56 MW to 1016.84 MW, cycle work from 520.36 MW to 538.20 MW, and thermal efficiency from 42.064% to 43.506%. These findings indicate that utilizing exhaust gas heat as a fuel gas heater enhances internal energy efficiency and reduces heat loss in the gas turbine system.
keywords: pinch analysis; DWSIM simulation; waste heat recovery; fuel gas pre-heater; GE 09HA.02 gas turbine

Item Type: Thesis (Masters)
Uncontrolled Keywords: analisis pinch; simulasi DWSIM; pemulihan panas limbah; pemanas awal gas bahan bakar; turbin gas GE 09HA.02
Subjects: Sciences and Mathemathic
Engineering
Divisions: Postgraduate Program > Master Program in Energy
Depositing User: ekana listianawati
Date Deposited: 09 Sep 2026 04:55
Last Modified: 09 Sep 2026 04:55
URI: https://eprints2.undip.ac.id/id/eprint/60755

Actions (login required)

View Item View Item