AZHAR, MUHAMMAD ALVARO (2026) ANALISIS PERBANDINGAN KESTABILAN LERENG METODE MORGENSTERN-PRICE DENGAN METODE BISHOP PADA TAMBANG TANAH LIAT PADA IUP MLIWANG, PT SEMEN INDONESIA (PERSERO) TBK, TUBAN, JAWA TIMUR. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.
|
Text
Alvaro.pdf Download (73kB) |
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Geological Engineering |
| Depositing User: | nurohmi pwk |
| Date Deposited: | 07 Aug 2026 06:47 |
| Last Modified: | 07 Aug 2026 06:47 |
| URI: | https://eprints2.undip.ac.id/id/eprint/58754 |
Actions (login required)
![]() |
View Item |
