Sihombing, Debora and Rahmadhanny, Talitha Shafiqah (2026) IMPLEMENTASI METODE PARTICLE SWARM OPTIMIZATION PADA PENJADWALAN PROYEK KONSTRUKSI BERBASIS RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.
|
Text (ABSTRAK)
Talitha Shafiqah Rahmadhanny.pdf Download (171kB) |
Abstract
Keterbatasan sumber daya tenaga kerja dan peralatan merupakan salah satu faktor yang dapat menyebabkan ketidakefisienan dalam penjadwalan proyek konstruksi.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Civil Engineering |
| Depositing User: | Mr sholikin FT |
| Date Deposited: | 06 Aug 2026 03:33 |
| Last Modified: | 06 Aug 2026 03:33 |
| URI: | https://eprints2.undip.ac.id/id/eprint/58629 |
Actions (login required)
![]() |
View Item |
