Fandillah, Dwi Rizki and Khoirunnisa, Aulia (2026) OPTIMASI BIAYA PROYEK MELALUI PENAMBAHAN JAM KERJA LEMBUR MENGGUNAKAN GENETIC ALGORITHM (Studi Kasus: Struktur Bunker Radioterapi RSUP dr. Soeradji Tirtonegoro). Undergraduate thesis, UNIVERSITAS DIPONEGORO.
|
Text (abstrak)
Dwi Rizki Fandillah.pdf Download (70kB) |
Abstract
Proyek pembangunan bunker radioterapi RSUP dr. Soeradji Tirtonegoro merupakan proyek dengan kompleksitas tinggi yang memerlukan standar keamanan sangat ketat.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Civil Engineering |
| Depositing User: | Mr sholikin FT |
| Date Deposited: | 23 Jul 2026 02:17 |
| Last Modified: | 23 Jul 2026 02:17 |
| URI: | https://eprints2.undip.ac.id/id/eprint/57462 |
Actions (login required)
![]() |
View Item |
