JUNIAWAN, MOCHAMMAD ALBI (2025) STUDI PERHITUNGAN CADANGAN HIDROKARBON RESERVOIR “61-7M” SEBAGAI ZONA BEHIND PIPE, PERENCANAAN PENGURASAN, SERTA ESTIMASI PRODUKSI PADA LAPANGAN ASTON, CEKUNGAN KUTAI, PROVINSI KALIMANTAN TIMUR. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.
|
Text (Abstrak)
GL107.pdf Download (171kB) |
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Geological Engineering |
| Depositing User: | nurohmi pwk |
| Date Deposited: | 13 May 2026 02:40 |
| Last Modified: | 13 May 2026 02:40 |
| URI: | https://eprints2.undip.ac.id/id/eprint/50861 |
Actions (login required)
![]() |
View Item |
