Search for collections on Undip Repository

STUDI PERHITUNGAN CADANGAN HIDROKARBON RESERVOIR “61-7M” SEBAGAI ZONA BEHIND PIPE, PERENCANAAN PENGURASAN, SERTA ESTIMASI PRODUKSI PADA LAPANGAN ASTON, CEKUNGAN KUTAI, PROVINSI KALIMANTAN TIMUR

JUNIAWAN, MOCHAMMAD ALBI (2025) STUDI PERHITUNGAN CADANGAN HIDROKARBON RESERVOIR “61-7M” SEBAGAI ZONA BEHIND PIPE, PERENCANAAN PENGURASAN, SERTA ESTIMASI PRODUKSI PADA LAPANGAN ASTON, CEKUNGAN KUTAI, PROVINSI KALIMANTAN TIMUR. Undergraduate thesis, UNIVERSITAS DIPONEGORO; FAKULTAS TEKNIK.

[thumbnail of Abstrak] Text (Abstrak)
GL107.pdf

Download (171kB)
Item Type: Thesis (Undergraduate)
Subjects: Engineering
Divisions: Faculty of Engineering > Department of Geological Engineering
Depositing User: nurohmi pwk
Date Deposited: 13 May 2026 02:40
Last Modified: 13 May 2026 02:40
URI: https://eprints2.undip.ac.id/id/eprint/50861

Actions (login required)

View Item View Item