Diyanto, Azzahra Yolanzha Ayu (2024) Perancangan Pengelolaan Risiko Supply Chain Pada Aktivitas Pengadaan Spare Part PLTU Tanjung Jati B Unit 3&4 Dengan Metode House Of Risk. Undergraduate thesis, UNIVERSITAS DIPONEGORO.
|
Text (ABSTRAK)
TI.24.167 Azzahra Yolanzha Ayu Diyanto.pdf Download (14kB) |
Abstract
Penelitian ini bertujuan untuk merancang pengelolaan risiko pada aktivitas rantai pasok pengadaan spare part di PLTU Tanjung Jati B Unit 3&4.
| Item Type: | Thesis (Undergraduate) |
|---|---|
| Subjects: | Engineering |
| Divisions: | Faculty of Engineering > Department of Industrial Engineering |
| Depositing User: | Mr sholikin FT |
| Date Deposited: | 23 Apr 2026 07:20 |
| Last Modified: | 23 Apr 2026 07:20 |
| URI: | https://eprints2.undip.ac.id/id/eprint/49818 |
Actions (login required)
![]() |
View Item |
