Search for collections on Undip Repository

Penerapan Sistem Building Information Modelling (BIM) Pada Re-Design Gedung Terpadu Psikologi Olahraga Universitas Negeri Surabaya

Nabil, Fajar Muhamad and Bagaskoro, MuMuhammad Ramadhan Tegar (2023) Penerapan Sistem Building Information Modelling (BIM) Pada Re-Design Gedung Terpadu Psikologi Olahraga Universitas Negeri Surabaya. Undergraduate thesis, Universitas Diponegoro.

[img] Text
BAB I_ Fajar & Muhammad.pdf - Published Version

Download (702kB)
[img] Text
BAB II_Fajar & Muhammad.pdf - Published Version

Download (3MB)
[img] Text
BAB III_Fajar & Muhammad.pdf - Published Version

Download (4MB)

Abstract

Building structure planning has an important role for further consideration before
the implementation of construction in the field to anticipate construction failure, so
it requires knowledge based on applicable rules and strengthened with the latest
technology in the form of BIM as a support for construction success. This research
aims to re-plan the structure of the UNESA Sports Psychology Integrated Building
using SAP2000, calculate the volume of work using Tekla structures to plan the
cost budget and duration of structural construction using Microsoft project, besides
that this research is used as knowledge in applying the concept of building structure
design with output in the form of structural dimensions along with reinforcement,
3D modeling, RAB, project scheduling in accordance with the rules of PPIUG
1983, SNI 1726-2019, SNI 1727-2020, SNI 2847-2019, and RSA Ciptakarya. The
method used is in the form of planning the dimensions of the upper structure,
analyzing the working load, analyzing the structure using SAP2000, planning the
lower structure with a strong bearing capacity to accept the vertical load of the
structure from the SAP2000 analysis results, planning the volume of work from 3D
modeling, budgeting costs and scheduling project implementation. Based on the
final results obtained for the floor slab has two types S1 (12 cm thick, Ø10-150),
S2 (10 cm thick, Ø10-150), Tiebeam and beams with types TB1 (40/75 cm 6D22),
B1 (50/70 cm 13D22), B2 (40/60 cm 9D19), B3 (30/50 cm 9D19), B4 (30/40 cm
8D19), Columns of type K1 (80/80 cm 22D22), K2 (70/70 cm 18D22), K3 (68/68
cm 16D22), K4 (60/60 cm 16D19), KL (43/43 cm 10D19), and foundations with a
diameter of 60 cm spunpilenumber 4 with pilecap dimensions (350/350 cm D16-
150). The structural cost budget plan with PPN11% is IDR 27,956,570,000. The
project is planned to start on June 5, 2023 and end on December 4, 2023 with a
duration of 27 weeks or 6 months and 1 week.
Keywords: BIM, SAP2000, Tekla Structures, Ms. Project.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: BIM, SAP2000, Tekla Structures, Ms. Project.
Subjects: Engineering > Civil Engineering
Engineering
Divisions: School of Vocation > Diploma in Civil Engineering
Depositing User: Oktavia Perpus Vokasi
Date Deposited: 03 Oct 2023 04:00
Last Modified: 03 Oct 2023 04:00
URI: https://eprints2.undip.ac.id/id/eprint/16845

Actions (login required)

View Item View Item